Dolwin II

Approached by Boskalis, SPS were asked to provide a suitable scour protection system for the Dolwinn II platforms.

Providing a suitable installation method for Concrete Fleximats along side the Dolwinn platform required trial lifts, and specifally detailed lifting arrangment. All tested by SPS for a safe & effective installation.  

18 tonne Concrete Fleximats supplied by SPS within a tight program, as well as varrious Heavy Duty drop bags for the scour protection on the Dolwinn II project.